Almost every refurb ends up over budget.
The problem is rarely one big issue. It’s usually several smaller unexpected problems. If they weren’t budgeted for, then there is no surprise the project costs more than expected.
What’s Behind the Walls
Damp.
Old wiring.
A floor that isn’t level.
Subsidence signs hidden under a fresh coat of paint.
None of this shows until a wall is opened or a floor is lifted. Make sure to budget for everything that could happen.
Contingency should be only for what you could not think of at all.